Menu

7 Days Chogoria Technical Climb Mount Kenya

7 Days

7 Days Chogoria Technical Climb

7 Days Chogoria Technical Climb Mt Kenya Hiking and technical climb, the climbing season for Nelion route is between mid-December and mid-March, when it is designated as grade IV+ and for Batian, June to October. We rate Batian marginally harder.

Take in the beauty of Mount Kenya’s most beautiful route Chogoria as you ascend.

  • Private Transfers
  • 5,199m
  • Camping
  • Nairobi
  • Jan, Feb, Mar, Apr, May, Jun, Jul, Aug, Sep, Oct, Nov, Dec
  • Technical Climb
  • English, French, German
  • Breakfast, Dinner, Lunch,

Overview

The Base Camp for the normal route to Nelion summit is the Austrian hut. Direct approach to Austrian hut is via the Naro Moru Route but it is also easy to access from the lengthier, but more interesting, Sirimon or Chogoria ascent trails. Getting to Austrian hut following the Naromoru route requires a minimum of 2 but preferably 3 days.
The Base of the normal route to Batian summit is Shipton’s Camp. This is normally approached from Sirimon or Chogoria trails requiring 2 or preferably 3 days. Descent from Austrian or Shipton’s via the Naro Moru Route can be done in a day but you should allow 2 days for descent on Sirimon or Chogoria routes.
Nelion and Batian are technical peaks with grades ranging from grade 3, 3+, 4 and 4+. Seasoned climbers with good climbing speed can manage Nelion route in 1 day, while less experienced or slower climbers take 2 days, with a night at Howell Hut on Nelion’s summit. Any climber wishing to cross the Gate of Mists to Batian summit from Nelion summit must be prepared to bivouac at Howell Hut. It is always advisable to dedicate 2 days for the climb regardless of your climbing ability to caution against bad weather conditions and impact of altitude.

For Batian it is advisable to take two days with a bivy at the Amphitheatre or above – thus allowing sufficient time for this long multi-pitch route.
There are fixed bolts for abseiling from Nelion but from Batian you need to build your own abseil points. The rock is solid though you can expect some loose rocks in sections of the climb.
There is plenty of running belays and scrambling while roped up. These are long climbs of 20 and 24 pitches, some of them 50 Meters and others 60 Meters long. NB: This is real mountain climbing and not trekking!
The climbing season for Nelion route is between mid-December and mid-March, when it is designated as grade IV+ and for Batian, June to October. We rate Batian marginally harder.

7 Days Mount Kenya Technical Climb Chogoria.

Highlights

  • Lake Ellis Campsite
  • Mintos Campsite
  • Austrian Hut
  • Lenana Peak 4,985m.
  • Nelion Peak 5,188m
  • Batian Peak 5,199m.

You can send your enquiry via the form below.

7 Days Chogoria Technical Climb Mount Kenya
From $1,605
/ Per person Group rate
From $1,712
/ Adult
  • Best Price Guaranteed
  • No Booking Fees
  • Professional Local Guide
  • Private Transfers
  • 5,199m
  • Camping
  • Nairobi
  • Jan, Feb, Mar, Apr, May, Jun, Jul, Aug, Sep, Oct, Nov, Dec
  • Technical Climb
  • English, French, German
  • Breakfast, Dinner, Lunch,